News Content
Panama Canal Authority finishes work on Pacific side's 3rd lock channel
THE Panama Canal Authority has completed work on the new access channel for the expanded canal section south of the Centennial Bridge in the Panama Canal, a few metres from Pedro Miguel Locks.
The new access channel will join the third set of locks with the Culebra Cut.
After two years, the excavation and dredging work was completed in October. Four million cubic metres of material were removed from the site to become the entrance for neopanamax vessels on the Pacific side, reports GAC port news.
Latest News
- For the first time, tianjin Port realized the whole process of dock operati...
- From January to August, piracy incidents in Asia increased by 38%!The situa...
- Quasi-conference TSA closes as role redundant in mega merger world
- Singapore says TPP, born again as CPTPP, is now headed for adoption
- Antwerp posts 5th record year with boxes up 4.3pc to 10 million TEU
- Savannah lifts record 4 million TEU in '17 as it deepens port