News Content
China Shipyard Repairs Panama Canal Damaged Container Ship
Owners of the Ilse Wulff decided to combine the repair of bottom plating and a deformed propellor blade by bringing forward the vessel's first special classification survey.
Ilse Wulff was put in to the CIC Jiuhuashan floating dock for the bottom plate and propeller blade inspections and the project work scope was confirmed by the owner’s superintendent, the class surveyor and the shipyard staff after careful inspection.
Work to clean and repaint the ship's hull coating was also put in hand.
The shipyard says that the owner was satisfied with the quality of the repairs and would look forward to further cooperation with them in the near future.
Source: Marine Link
Ilse Wulff was put in to the CIC Jiuhuashan floating dock for the bottom plate and propeller blade inspections and the project work scope was confirmed by the owner’s superintendent, the class surveyor and the shipyard staff after careful inspection.
Work to clean and repaint the ship's hull coating was also put in hand.
The shipyard says that the owner was satisfied with the quality of the repairs and would look forward to further cooperation with them in the near future.
Source: Marine Link
Latest News
- Shipbuilding In 2017: Any Signs Of Improvement?
- Keppel in talks with Borr Drilling for rig sales
- Japan’s shipbuilding industry turning corner as orders double
- De Boer/Dutch Dredging and Iskes Towage take delivery of ASD 2310 SD at Dam...
- Chinese shipyard order more TTS cranes
- Kommer Damen opens Damen Area Support China