Welcome to Shipping Online!   [Sign In]
Back to Homepage
Already a Member? Sign In
CHENG AN WEI SHIPYARD

Ship rebuilding



THE RECORD OF SHIP REBUILDING IN RECENT YEAR:
 
Year
Ship
name
Rebuilding content
1994
HENG HAI
It was roll-off ship originally,the upper part of its main deck was burned down. We redesigned and built the superstructure.
YE DAO
It was train-ferry originally, we altered it to car-roll ship by rebuilding main deck.
1995
NAN HAI
213
Oil tank to slurry tank.
NAN HAI
215
Oil tank to slurry tank.
NAN HAI
212
Cement room to sluury tank.
1996
NAN HAI
206
Fore laterl thruster removed and rebuild a larger power one.Designed and built by the shipyard.
NAN HAI
502
After average,the superstruture erected.
1997
MIN HAI
YOU188
Oil tank modification.
YU HAI
NO.1
Cut off it in the middle, and lengthen it for 12 meters.
NAN HAI
215
Fore laterster thruster disengaged and installated a larger power one.Designed and operated by the shipyard.
NAN HAI
209
Fore laterster thruster disengaged and installated a larger power one.Designed and operated by the shipyard.
1998
XING AN
HAI
Cargo ship refit to asphaltship,which was the first one in GUANGZHOU area.
NAN HAI
210
Fore laterster thruster disengaged and installated a larger power one.Designed and operated by the shipyard.
1999
NAN HAI
211
Fore laterster thruster disengaged and installated a larger power one.Designed and operated by the shipyard.
WANG QUAN
HAI
Cargo ship to asphaltship
HONG QI
188
Cargo ship to container ship
HONG QI
189
Cargo ship to container ship
AO TUO
624
Newly-built
2000
HUA TONG
Fore laterster thruster disengaged and installated a larger power one.Designed and operated by the shipyard.
2001
AN JI
JIANG
Cargo ship to asphaltship
JIANG XIN
Removed the bow part, and heighten it for one meter.Designing and operating by the shipyard.
2002
JIANG XIN3
Removed the bow part, and heighten it for 1.2 meter.Designing and operating by the shipyard.
AN DA JING
Cargo ship to asphaltship.
YA JING
Cargo ship to asphaltship.
HAN JING
Cargo ship to asphaltship.


TYPICAL CASE:

      
     Thrust propeller rebuilding
 
  Lengthen the hull


      
      Asphalt  container hoisting
 
      Stem  repair


Send E-mail

E-mail: *
Telephone:
Message:
 
About Us| Service| Membership and Fee| AD Service| Help| Sitemap| Links| Contact Us| Terms of Use