Info. No. S3217 
Vessel Type Dredger 
Capacity 1 DWT
Built Year 2019 
Built Place Russia 
Port of Registry Russia 
Class RS 
Loa/B/D 19.4/5.3/1.5M
Price Idea
Post Date 20 Nov 2018 
Due Date 20 Dec 2018 
Note 348. Dredger with walking / vertical piles.

TBN: 640
Status: sale
Condition: in construction
Navigation area: river
Type: Dredgers
Subtype: reflow dredger
Appointment: dredging and mining of nonmetallic building materials
Construction date: 2019
Construction place: St. Petersburg
Length over all: 19.4 m
Width: 5.3 m
Board height: 1.5 m
Draught min.: 0.85 m
Air draught: 0.65 m
Main engines power: 522.0 kW
Location: EU

1) The basic version of the dredger with "walking" piles and lifting the trunk of hydraulic cylinders.
 With the help of piles, each of which is equipped with two hydraulic cylinders and a depth control system, the dredger can independently enter the water, move around the water area and leave the water. In the case of towing, the piles are piled forward, the mast is back, and the clearance for passage under bridges is 3.5 m.
2) The basic version of the dredger with "walking" piles and lifting the trunk with a winch through the portal.
With the help of piles, each of which is equipped with two hydraulic cylinders and a depth control system, the dredger can independently enter the water, move around the water area and leave the water. Suspension of the trunk on the cable reduces the likelihood of mechanical damage to the trunk. In the case of towing, the piles are piled forward, the mast is back, the bow portal is forward or backward, and the clearance for passage under bridges is 3.5 m.
3) The basic version of the dredge with "walking" piles, lifting the trunk of hydraulic cylinders and arrows for anchors.
With the help of piles, each of which is equipped with two hydraulic cylinders and a depth control system, the dredger can independently enter the water, move around the water area and leave the water. Arrows 12m long allow the dredger to independently anchor. In the case of towing, the piles are piled forward, the mast is back, and the clearance for passage under bridges is 3.5 m, but dismantling of columns and arrows is required.
4) The extended version of the dredger with vertical piles and the lifting of the elongated trunk winch.
The dredger is equipped with a classic system of vertically moving piles. Lifting of piles is carried out with the help of hydraulic cylinders, the capture of piles is carried out with the help of a strangulation from a cable. Suspension of the trunk on the cable reduces the likelihood of mechanical damage to the trunk. Towing under bridges with a height of less than 4m requires the collapse of the nasal gantry, as well as the dismantling of the hydraulic cylinders of the piles and the piles themselves.
5) An extended version of the dredger with vertical piles, lifting an elongated trunk with a winch and arrows for anchoring.
 The dredger is equipped with a classic system of vertically moving piles. Lifting of piles is carried out with the help of hydraulic cylinders, the capture of piles is carried out with the help of a strangulation from a cable. Arrows 12m long allow the dredger to independently anchor. Suspension of the trunk on the cable reduces the likelihood of mechanical damage to the trunk. Towing under bridges with a height of less than 4m requires the collapse of the nasal gantry, as well as the dismantling of columns, hydraulic cylinders of piles, piles themselves and arrows.
 

Vessel's Photo  

 

Contact Information
The Contact Information is restricted to our Premium Member only, if you are a Premium Member, please Sign In first.
Searches
Ships for Sale Ships for Purchase
to
-
About Us| Service| Membership and Fee| AD Service| Help| Sitemap| Links| Contact Us| Terms of Use